Morrison Hershfield designed new members and prepared shop drawings, as well as designed a crane-lifting bracket to support the towers during the sequential removal of the legs while the tower remained “live.”
Morrison Hershfield was able to provide the requisite engineering skills to meet the tight design and construction window to ensure the repairs were made before the next winter season.