Skip Ribbon Commands
Skip to main content
Morrison Hershfield > Solutions
P3 School Site Investigations
Morrison Hershfield P3 School Site Investigations
Site investigations were performed for six proposed public schools and three proposed catholic schools in the Edmonton area for Alberta Infrastructure.  We provided key background information in a consolidated format for each school site, and distributed reports to shortlisted proponent teams as background for their bid preparations.

A complete assessment was compiled including base drawings and historical data, used as background information for future P3 proponents involved with the Alberta Schools Alternative Procurement program (ASAP P3).  We provided an understanding of site conditions based on results of site investigations covering land status, access and transportation issues, water, sanitary sewer, storm sewer an drainage, gas, telephone and power.  A subconsultant performed geotechnical investigations and environmental site assessments. 

In completing this assignment we:

  • Determined land status, ownership, easements, right of ways
  • Conducted contour mapping
  • Provided site services and capacities/capabilities
  • Assessed transportation access, road details and public transport availability
  • Reviewed phase 1 environmental site assessments
  • Conducted geotechnical investigations
  • Conducted floodplain studies
  • Conducted archeological studies
Sign In