Services provided include: collection and review of system data; preparation of design plans and specifications; construction inspection; public consultation strategy; detailed design and project management of the water treatment facility; feasibility analysis of filtration methods; sizing of treated water storage; and detailed design to Alberta Environment’s performance standards and Guidelines for Canadian Drinking Water Quality.
The total treated water storage of the water treatment plant is 1,200 m3, which includes the fire water storage for the Speargrass and the Kenwyn sites. The water treatment plant is also designed to be capable of meeting 110% of the maximum day demand for both the Hamlet of Carseland and the Speargrass development in order to account for in-plant losses. The total water demand was designed to 22 L/sec.