Skip Ribbon Commands
Skip to main content
Morrison Hershfield > Solutions
High School Energy Efficient System Upgrades
High School Energy Efficient System Upgrades
This project at Assumption College stemmed from recommendations in a detailed energy audit and conceptual design study. The scope of work included replacement of conventional boilers and the Building Automation System, reconfiguration of the heating system piping, retrofit of the Makeup Air units, the constant speed fans and water distribution pumps and redesign of the school air-conditioning units and light fixtures control sequence.
In addition to preparing tender documents, Morrison Hershfield also provided project management and on-site installation review. The energy savings anticipated from the upgrades implemented under this project is estimated to be 30% of the school’s current energy consumption. Morrison Hershfield was also able to apply for and obtain incentive funding from the local natural gas utility for this project.
Sign In