|
Content Menu This project at Assumption College stemmed from recommendations in a detailed energy audit and conceptual design study. The scope of work included replacement of conventional boilers and the Building Automation System, reconfiguration of the heating system piping, retrofit of the Makeup Air units, the constant speed fans and water distribution pumps and redesign of the school air-conditioning units and light fixtures control sequence.
|