Each of the two buildings in the project was designed for 500 watts/sf power load. The project included engineering design for a 100MW power substation. The facility housed more than 300,000 servers and was cooled by chilled water.
Morrison Hershfield developed innovative solutions to strenuous site requirements. Interior design expertise helped resolve space planning concerns.