Skip Ribbon Commands
Skip to main content
Morrison Hershfield > Solutions
Firewater Upgrade at a Chemical Facility
Nova Chemicals Firewater Upgrade
The Nova Joffre site's original firewater system was reaching the end of its useful life.  We were retained to evaluate the firewater system, design a replacement system capable of meeting the necessary fire flows and to provide construction services for the two summers during the replacement program. 
The design included validating the required fire flows and conducting a hydraulic analysis to ensure the new design would meet insurance requirements.  This project was a cooperative effort from all divisions to provide the necessary expertise.  One of the biggest issues was locating the firewater system to avoid impacting the existing underground services.
Sign In